Workers and machinery arranged across a large manufacturing production floor

Manufacturing / Factory & Plant

Spaces that work.Industry that lasts.

Bring buildings, equipment and operation together. Explore industrial layouts, utilities, installation, commissioning interfaces and lifecycle planning for production and processing facilities.

Discuss your project
People. Purpose. Possibility.Explore factory & plant

The bigger picture

The building and the process belong in one plan.

New facilitiesPlant extensionsEquipment integrationStaged upgrades

An industrial facility is a network of connected requirements. Equipment needs access, utilities and space; people need workable layouts; maintenance needs to be possible after installation. Considering the building separately from the process can leave important interfaces unresolved. A coordinated approach brings the physical facility and its intended operation into one project brief, with specialist inputs and technical responsibilities clearly defined before the next stage begins.

  • Building and equipment interfaces aligned
  • Installation and access considered early
  • An agreed path into operation

Services & capabilities

Expertise with
a practical purpose.

Explore the workstreams relevant to your project. The service scope and delivery responsibilities are agreed around your requirements.

01

Facility & industrial layout

Bring production flow, equipment positions and supporting spaces into a coordinated layout brief. Consider people, materials, access and maintenance alongside the intended operating model.

Discuss this service
02

Structures & supporting infrastructure

Coordinate the building and civil requirements that support the facility. Identify equipment loads, access, service areas and specialist structural inputs needed for detailed design.

Discuss this service
03

Utilities & mechanical interfaces

Map the utility and mechanical requirements of the proposed equipment and process. Technical design, capacity calculations and approvals belong with the relevant qualified specialists.

Discuss this service
04

Equipment & installation planning

Consider delivery access, lifting, storage and installation sequence before equipment arrives. Agree the interfaces between suppliers, building contractors and the team receiving the facility.

Discuss this service
05

Commissioning & readiness coordination

Define the planned checks, trial requirements and handover information. Technical commissioning and acceptance responsibilities should be assigned to the competent parties for each system.

Discuss this service
06

Maintenance & lifecycle planning

Think beyond the start of operation. Include access for servicing, documentation, replacement requirements and the relationship between maintenance activities and the facility's everyday work.

Discuss this service
Engineers work beside large mechanical frames inside a manufacturing facility
Industry in focus

A working facility is more than its floor plan.

The details that matter

Bring the building and the process together.

The equipment, its services and the people around it have to work as a whole. Make those connections part of the facility brief.

Map the production sequence, handling routes and supporting areas. Review equipment positions alongside maintenance access, storage and the everyday movement of people.

Record the services each item of equipment needs and identify specialist design inputs. Coordinate connection locations, installation access and responsibility for testing.

Review equipment dimensions, delivery access, storage and the sequence of placement. Clarify what the building and each supplier must have ready before installation begins.

Agree system checks, trial operations, documents and training inputs. Make acceptance responsibility and the handling of outstanding work visible to all receiving teams.

Putting the pieces together

What could your
next project look like?

Two starting points for a practical conversation about factory & plant.

Illustrative applications · not completed projects
Application 01

A coordinated processing facility

A processing project can connect buildings, utilities, equipment and handling. A shared brief helps reveal the dependencies that need specialist design and careful installation planning.

Discuss a similar idea
Application 02

Extending a working factory

An expansion may need to fit around ongoing production. Existing systems, access limitations and operational interfaces become central to the sequence and scope of the proposed works.

Discuss a similar idea

From the first conversation

A clear path
through complexity.

Connect the right decisions at each stage, with the next step visible to everyone involved.

01

Define the operation

Understand what the facility will do, the equipment involved and the constraints of the site.

02

Coordinate the facility

Align building, layout, utilities and installation requirements with specialist technical input.

03

Sequence implementation

Agree supplier interfaces, access, responsibilities and readiness checks before work proceeds.

04

Prepare the handover

Confirm technical records, acceptance requirements, training inputs and the transition into operation.

The people around the project

Different disciplines.
A shared outcome.

Bring specialist knowledge and practical experience into the same conversation. Roles and appointments depend on the work.

Our people & approach
01

Plant operations

Production needs and operational readiness.

02

Facility engineering

Building, utilities and equipment interfaces.

03

Installation partners

Delivery, access and work sequencing.

04

Maintenance teams

Service access, records and lifecycle needs.

Industrial plant exterior with multiple tall red-and-white chimneys

Quality & coordination

Care in the detail.
Clarity in the delivery.

Industrial facilities need clear interfaces between design, construction, equipment supply and operation. The scope should set out technical authority, inspection requirements, commissioning responsibility and acceptance evidence. Safety and statutory obligations are determined for the particular site and systems. Documentation, maintenance access and operator readiness should be addressed alongside physical completion, rather than left to the end.

Explore our approach

A useful first conversation

Bring your idea.
We’ll start with the brief.

You do not need every answer to begin. Share the information you have and highlight the decisions still ahead.

01

Process & output

What the facility will produce and how the process is expected to work.

02

Building & site

Location, available layouts and existing structural information.

03

Equipment & utilities

Machinery information, service needs and supplier contacts.

04

Installation & operation

Access limitations, shutdown windows and handover priorities.

Questions before you start

A little clarity.

Useful answers for a factory & plant brief.

Ask us a question

A phased brief can be explored. Describe which operations must continue, any shutdown opportunities and the dependencies between new work and existing facilities or equipment.

Not automatically. Equipment selection, purchasing, supply and installation are distinct responsibilities. The agreement must state which parties handle them and how their work connects.

Acceptance authority and evidence should be agreed before commissioning. The client, technical specialists, equipment suppliers and operators may each have defined review or sign-off responsibilities.

Share the intended process, location, available layout, equipment information and timing. Identify existing operations or site constraints that the project will need to work around.